Industrial and logistics plants

STI – Coca Cola Nogara

TECHBAU S.p.A.
Nogara – VR | Italy

Refurbishment and expansion of a logistics hub consisting of 65,200 sqm warehouse (of which 31,000 sqm is additional construction and 34,200 sqm is refurbished), with 68 loading bays and 1,200 sqm of office space. The new part of the complex is prefabricated using vibrated reinforced concrete and pretensioned reinforced concrete with a bacacier type roof and precast concrete and metal panel walling. The project includes MEP installation works, offsite works and all external works (plot area 113,000 sqm). The building is LEED certified.

113.000

sqm PLOT AREA

66.400

sqm

65.200

sqm WAREHOUSE

1.200

sqm OFFICES

68

LOADING BAYS

Aim of the work:

Development, Engineering, Procurement and Construction

Customer:

Techbau S.p.A.

Start:

01 / 2016

End:

01 / 2017

The building is BREEAM
certified Very Good.