![](https://www.techbau.it/wp-content/uploads/2023/11/Cassano-Magnago-Tigros-jpg.webp)
Industrial and logistics plants
Tigros Cassano Magnago
TIGROS
Cassano Magnago – VA | Italy
Construction of a logistics hub consisting of 26,000 sqm warehouse with 44 loading bays and 800 sqm of office space. The building is prefabricated using vibrated reinforced concrete and pretensioned reinforced concrete. It contemplates wing-shaped roofing beams and precast concrete panel walling. The project includes MEP installations, offsite works and all external works (plot area 67,000 sqm).
67.000
sqm PLOT AREA
26.800
sqm
26.000
sqm WAREHOUSE
800
sqm OFFICES
44
LOADING BAYS
![](https://www.techbau.it/wp-content/uploads/2023/10/techbau-building-costruction-data.png)
Aim of the work:
Development, Engineering, Procurement and Construction
Customer:
Tigros S.p.A.
Start:
01 / 2015
End:
01 / 2016
![](https://www.techbau.it/wp-content/uploads/2023/10/breeam.png)
The building is BREEAM
certified Very Good.